Examveda

If is the diameter of upper circular portion, the overall depth of New Egg shaped sewer section, is

A. 1.250 D

B. 1.350 D

C. 1.425 D

D. 1.625 D

Answer: Option D


This Question Belongs to Civil Engineering >> Waste Water Engineering

Join The Discussion

Comments (1)

  1. Riju Chakraborty
    Riju Chakraborty:
    4 weeks ago

    New Egg shaped sewer
    Diameter of upper circular portion=1.5D
    Diameter of lower circular portion=2.0D

Related Questions on Waste Water Engineering